Site-specific design for builders and developers
Overview
Azure Design Studio helps Edmonton builders and developers plan infill projects on established residential lots. Our focus is multifamily and missing-middle housing, including duplexes and row houses, with builder-led single-family spec homes also considered. We coordinate design and permit applications around the site and the agreed project scope.
Start with the site, not an assumed unit count. Lot dimensions, access, existing buildings, registered interests, servicing and the current zoning rules can all affect the design direction. Bring the property address, available survey or site information, intended number of units and your target timeline to the initial discussion. If you have not secured the site, say so: early design advice is not a substitute for purchase due diligence.
Edmonton’s current Zoning Bylaw and zoning map are the starting point for a site-specific review. Older RF-zone descriptions and mature-neighbourhood overlay guidance should not be treated as current permission to build. We review the applicable requirements and flag questions for City review before developing the concept. A concept is not a guarantee of a particular density, variance or approval.
Once the brief is agreed, design work can include site planning, floor plans, elevations and the drawings needed for the agreed permit scope. Engineering, grading, drainage and utility input may be required from project consultants. Azure coordinates with those parties; your proposal should identify who supplies each report, drawing or assessment and whether consultant fees are separate.
Development and building permit applications address different aspects of a project. The submission requirements depend on the proposal, so we establish the required application information and coordinate responses during review. Hands-off permit support means managing the application work within our scope, not controlling City or utility decisions. Review times vary and approvals are not guaranteed.
For a useful first conversation, tell us whether you are a builder or developer, whether the lot is secured, what you intend to build and which services you need. We can then discuss the next design step and prepare a scope rather than assuming every project needs the same package.
Residential and multifamily design · Edmonton infill design
Row house design · Development and building permit support · LID garden design · 2027 landscape security deposit
Check current requirements with the City of Edmonton Zoning Bylaw and house permit application requirements. Requirements are project-specific.
Builders and developers planning Edmonton multifamily infill, duplexes, row housing or single-family spec projects. Custom owner-occupied homes are not our current focus.

Contemporary Infill Development

Minimalist Townhomes

Infill Construction

Modern Infill Home
Share the address, available site information, intended units and timeline. We identify the design brief and questions that need further investigation.
Agree the services and responsibilities, then develop a site-specific layout and concept for your review.
Develop the agreed drawing package and coordinate required information with engineers and other project consultants.
Submit the agreed applications and coordinate responses to review comments. City and utility approvals remain outside our control.
Let's talk about your project. Schedule a consultation and we'll take it from there.